Document text
Extracted from the official document; OCR may contain errors.
ENVIRONMENT
REVISED 7/9/2025
RE:
RESOLUTION NO. 2025104
AMENDING RESOLUTION NO. 2023223 CONSENTING TO
THE ISSUANCE BY THE DUTCHESS COUNTY WATER AND
WASTEWATER AUTHORITY OF ITS SERVICE AGREEMENT
REVENUE NOTES AND BONDS
WHEREAS, the County of Dutchess, New York (the "County"), for and on behalf of the
Dutchess County Water District, and the Dutchess County Water and Wastewater Authority (the
"Authority"), have entered into a Service Agreement, Amended and Nineteenth Restatement as of
April 23, 2024, relating to an integrated water supply, purification and distribution system (the
"Service Agreement"), and
WHEREAS, by Resolution No. 2023223, the County consented to the issuance by the
Authority of its Notes and Bonds provided that the aggregate principal amount of the Notes and
Bonds does not exceed $2,200,000, and consented to the inclusion in the Service Fee provided by
Section 5.2 of the Service Agreement of debt service on the Notes and Bonds to finance
construction of the Peach Road Water System and interconnection to the Town of Poughkeepsie
water distribution system to provide a new water supply source for the BOCES Campus and
Dutchess County Auto Center facility to replace the current groundwater wells serving each
property, and
WHEREAS, by this Resolution, the Authority proposes to issue notes and bonds not to
exceed $2,700,000. (the "Notes and Bonds") to finance the increased costs associated with the
project resulting from further development of the design for the water line construction and from
cost escalation in the construction industry subsequent to the initial approval, and
WHEREAS, Section 5.2(a) of the Service Agreement requires the consent of the County
to the issuance of such Notes and Bonds, now, therefore, be it
RESOLVED, by the County Legislature of the County of Dutchess, New York as follows:
Section 1.
The County of Dutchess, New York hereby consents to the issuance by the
Dutchess County Water and Wastewater Authority of its Notes and Bonds provided that the
aggregate principal amount of the Notes and Bonds does not exceed $2,700,000. The County of
Dutchess further consents to the inclusion of debt service on the Notes and Bonds in the Service
Fee provided by Section 5.2 of the Service Agreement.
Section 2.
This Resolution takes effect immediately.
CA-066-25
CRC/rjw
06/06/25
G- 1217-Z.
Fiscal Impact: See Attached
APPROVED
Susarberira
SUSAN J. SERINO
COUNTY EXECUTIVE
Date _taly 17,2025
STATE OF NEW YORK
ss:
COUNTY OF DUTCHESS
This is to certify that I, the undersigned Clerk of the Legislature of the County of Dutchess, have compared the foregoing resolution with
the original resolution now on file in the office of said clerk, and which was adopted by said legislature on the 14 day of July 2025, and that the same
is a truc and correct transcript of said original resolution and of the whole thereof.
IN WITNESS WHEREOF, I have hercunto set my hand and scal of said Legislature this 14" day of July 2025.
Lushlager
CERTIFICATION FORM
STATE OF NEW YORK
COUNTY OF DUTCHESS
) SS.:
)
I, the undersigned Clerk of the County of Dutchess, New York (the "County"), DO
HEREBY CERTIFY:
1
2025.
2.
That a meeting of the County was duly called, held and conducted on the 14 day of July,
That such meeting was regular meeting.
That attached hereto is a proceeding of the County which was duly adopted at such meeting
by the Board of the County.
4. That such attachment constitutes a true and correct copy of the entirety of such proceeding
as so adopted by said Board.
That all members of the Board of the County had due notice of said meeting.
That said meeting was open to the general public in accordance with Section 103 of the
Public Officers Law, commonly referred to as the "Open Meetings Law".
That notice of said meeting (the meeting at which the proceeding was adopted) was caused
to be given PRIOR THERETO in the following manner:
PUBLICATION
POSTING
Southern Dutchess News
Poughkeepsie Journal
22 Market Street, 6 Floor
County Office Building
Poughkeepsie, NY 12601
July 11, 2025
July 11, 2025
July 11, 2025
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the County
Legislature this 14 day of July, 2025.
NO FISCAL IMPACT PROJECTED
Total Current Year Cost $_
Total Current Year Revenue $
and Source
FISCAL IMPACT STATEMENT
APPROPRIATION RESOLUTIONS
(To be completed by requesting department)
Source of County Funds (check one):
Existing Appropriations,
•contingency,
•Transfer of Existing Appropriations,
• Additional Appropriations, I
• Other (explain).
Identify Line Items(s):
Related Expenses: Amount $
Nature/Reason:
Anticipated Savings to County:
Net County Cost (this year):
Over Five Years:
Additional Comments/Explanation:
Prepared by: B.Barclay
Prepared On: June 3, 2025
Dut pdf
DUTCHESS BOCES
Jodi DeLucia, Ph.D.
District Superintendent
Matthew Metzger
School Business Official
845.486.4800 Ext. 2228
[email protected]
July 10, 2025
Mr. Jonathan Churins,
Executive Director
Dutchess County Water and Wastewater Authority
1 LaGrange Avenue
Poughkeepsie, NY 12603
Dear Mr. Churins,
Please accept this letter as a commitment from Dutchess BOCES in support of the Peach Road Water Line Extension
Project.
Michael Skerritt, Assistant Superintendent of Business Operations and Facilities, and I attended yesterday's bid opening at
the Dutchess County Water and Wastewater Authority (DWWA). We were relieved to see so many contractors submitting
bids for this project.
Dutchess BOCES and their Board of Trustees fully understand the financial support that we will need to provide for this
project. We are hopeful that the Water and Wastewater Authority will secure the necessary authorization from the County
Legislature. We remain fully committed to this project, as we believe municipal water is the best option for our campus.
As you are aware, Dutchess BOCES currently relies on a deteriorating well. The water's hardness has adversely affected
our pipes, leading to frequent failures in our heating system's plumbing during winter months. Our goal since on or about
2019 has been to secure the best possible water supply for our campus to ensure the safety of our students and employees.
This has been a long process, and we hope municipal water will soon be available to our campus. For your continued
efforts, Dutchess BOCES thanks the DCWWA.
Please let us know if there is anything else we can do to support this project.
Sincerely,
mato m
Matthew Metzger
CC:
Jodi DeLucia, District Superintendent
Michael Skerritt, Assistant Superintendent of Business Operations and Facilities
Ed Mills, Project Facilitator DCWWA
Dutchess BOCES, 5 BOCES Road, Poughkeepsie, NY 12601 | 845.486.4800 | www.dcboces.org
Participating districts: Arlington | Beacon | Dover | Hyde Park | Millbrook | Pawling | Pine Plains | Poughkeepsie | Red Hook | Rhinebeck |
Spackenkill | Wappingers | Webutuck
m:\business office admin teamladministration\dowwaldowwa letter of commitment 7 10 2025 revised.docx
AND
ASTEWATER AUTHORITY
MEMORANDUM
To:
From:
Subject:
Date:
Dutchess County Legislature
Jonathan Churins, Executive Director, DCWWA
Update on Peach Road Water Line Project - Status and Next Steps
Tuesday, June 24, 2025
Update on Peach Road Water Line Project
I'm writing to provide a status update on the Peach Road Water Line Project, which will serve the Dutchess
County BOCES, Dutchess County Vehicle Maintenance Facility and Dutchess County Weights & Measures
Office.
As of February 2025, BOCES Design Engineer secured DOH approval for the project. On May 9th, we
published the construction bid advertisement. An RFP for Construction Administration and Observation
services was released May 9t.
All bidding and proposal timelines are aligned with the project schedule to ensure all construction costs
are known by July 9th. A copy of the proposed project schedule is offered below with the tentative
construction milestones attached for your reference. Once a contractor has been hired, a more defined
construction schedule will be created
Please note that under New York State General Municipal Law, construction bids are subject to the 45-
day bidding rule. If no award decision is made within 45 days of the bid opening, bidders may withdraw
their bids without penalty. Although this is unlikely, we are working to ensure all required decisions and
approvals are aligned with this window.
Financial Considerations
Estimated Total Project Cost: $5M
The Estimated Total Project Cost exceeds the bonding authority of $2.2M approved via DC Legislature
Resolution 2023223. Should the total construction costs based on actual bids exceed this threshold, we
have submitted a draft county resolution to the Dutchess County Legislature to align borrowing
authority with then known project cost. The draft resolution was submitted on June 3rd and then will
be updated ahead of the July 10th Legislature Committee Meeting.
Resolution provides County Consent to inclusion of debt service in the Service Fee per the Service
Agreement.
A key point is that the County is NOT co-signing debt or otherwise obligated on DCWWA debt for this
project.
ATER AND
ASTEWATER AUTHORITY
MEMORANDUM
Key Upcoming Milestones
• Advertisement for Construction Bid and Construction Administration RFP: May 9th
• County Resolution Request Deadline: June 3rd
• RFP for Construction Administration and Observation services Proposals Due: June 18th
• Construction Bids Due: July gth
• County Legislature Committee Meeting: July 10th
• County Legislature Meeting: July 14th
• DCWWA Board - BAN Approval: July 16th
• Issue BAN Request: July 17th
• BAN Award: August 5th
• DCWWA Board - Construction Contract Award: August 20th
Following contract awards we aim to achieve the proposed tight timeline, by immediately initiating
construction submittals and working with contractors to secure necessary materials during winter 2025.
Major equipment includes a generator, pumps, and ductile iron cement-lined pipe and fittings. Full
construction is planned for spring-fall 2026.
Please let me know if you have any questions or would like to discuss further.
Respectfully,
Jonathan Churins
Executive Director
Dutchess County Water and Wastewater Authority
IVILIIUAHIUUIVI
WATER AN
ASTEWATER AUTHORIT
To:
From:
Subject:
Date:
Sue Serino, County Executive
Jonathan Churins, Executive Director
Dutchess County Water & Wastewater Authority
1 Lagrange Avenue
Poughkeepsie, NY 12603
845-486-3601
[email protected]
Resolution Request
June 3, 2025
Please find attached a Resolution Request Form and Fiscal Impact Statement. The purpose of the
requested resolution is to obtain County consent to the issuance of Peach Road Water System (County
Water District Zone of Assessment Z) Notes and Bonds in an aggregate amount not to exceed $000000.
The purpose of the Notes and Bonds is to fund construction of the Peach Road Water System and
interconnection to the Town of Poughkeepsie water distribution system. This will provide a new water
supply source for the BOCES Campus and Dutchess County auto center facility to replace the current
groundwater wells serving each property.
The County, by Resolution No. 2023223, previously consented to the issuance of bonds and notes not to
exceed $2,200,000. The purpose of this request is to fund increased costs associated with the project,
resulting from further development of the design for the water line construction and from cost
escalation in the construction industry subsequent to the initial approval.
Debt service on the Notes and Bonds will become a component of the County Service Fee payable by the
County to the Authority pursuant to the Service Agreement by and between the County on behalf of the
County Water District and the Dutchess County Water and Wastewater Authority, Dated June 1, 1998,
Amended and Nineteenth Restatement as of April 23, 2024. The County will generate the revenues
necessary to pay this component of the Service Fee by levying benefit assessments against all properties
within the County Water District Zones of Assessment Z.
A copy of Resolution 2023223 is attached.
ENVIRONMENT
RE:
RESOLUTION NO. 2023223
CONSENTING TO THE ISSUANCE BY THE DUTCHESS
COUNTY WATER AND WASTEWATER AUTHORITY OF
ITS SERVICE AGREEMENT REVENUE NOTES AND BONDS
Legislators CAVACCINI, TRUITT, HOUSTON, SAGLIANO, D'AQUANNI, CASWELL, and KEITH
offer the following and move its adoption:
WHEREAS, the County OF Dutchess, New York (the "County"), for and on behalf of the Dutchess
WHEREAS, the Authority proposes to issue notes and bonds not to exceed $2,200,000 (the "Notes and
Bonds") to finance construction of the Peach Road Water System and interconnection to the Town of
Poughkeepsie water distribution system to provide a new water supply source for the BOCES Campus and
Dutchess County Auto Center facility to replace the current groundwater wells serving each property, and
WHEREAS, Section 5.2(a) of the Service Agreement requires the consent of the County to the issuance
of such Notes and Bonds, now, therefore, be it
RESOLVED, by the County Legislature of the County of Dutchess, New York as follows:
Section 1.
The Dutchess County, New York hereby consents to the issuance by the Dutchess County
Water and Wastewater Authority of its Notes and Bonds provided that the aggregate principal amount of the
Notes and Bonds does not exceed $2,200,000. The County of Dutchess further consents to the inclusion of the
Service Fee provided by Section 5.2 of the Service Agreement of debt service on the Notes and Bonds.
Section 2.
This Resolution takes effect immediately.
CA-160-23
CRC/jw
11/08/23
G-1217-Z
Fiscal Impact: See Attached
WATTAM FX. O'NEIL
ACTING COUNTY EXECUTIVE
Deto 12/14/23
STATE OF NEW YORK
ss:
COUNTY OF DUTCHESS
This is to certify that I, the nadersigned Clerk of the Legislature of the County of Dorchess, have compared the forgoing resolution with the original resolution
now on file in the office of said cler, and which was adopted by wad Legislature on the To day of December 2023, and that the same is a true and correct transcript of sand
original resolution and of che whole thereof.
INWITNESS WHARTOF, I have hercunto set may hand and scal of said Lepilatire this 7o dagut Degembor 2023.
righ agen
CERTIFICATION FORM
)
) SS.:
STATE OF NEW YORK
COUNTY OF DUTCHESS
I, the undersigned Clerk of the County of Dutchess, New York (the "County"), DO
HEREBY CERTIFY:
That a meeting of the County was duly called, held and conducted on the 7 day of
December 2023.
2.
That such meeting was regular meeting.
That attached hereto is a proceeding of the County which was duly adopted at such meeting
by the Board of the County.
4.
5.
6.
7.
That such attachment constitutes a true and correct copy of the entirety of such proceeding
as so adopted by said Board.
That all members of the Board of the County had due notice of said meeting.
That said meeting was open to the general public in accordance with Section 103 of the
Public Officers Law, commonly referred to as the "Open Meetings Law".
That notice of said meeting (the meeting at which the proceeding was adopted) was caused
to be given PRIOR THERETO in the following manner:
PUBLICATION
POSTING
Southern Dutchess News
Poughkeepsie Journal
December 5, 2023
December 5, 2023
22 Market Street, 6' Floor
December 5, 2023
County Office Building
Poughkeepsie, NY 12601
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the County
Legislature this 8 day of December 2023.
Geigh Wager.
NO FISCAL IMPACT PROJECTED
Total Current Year Cost $
Total Current Year Revenue $
and Source
FISCAL IMPACT STATEMENT
APPROPRIATION RESOLUTIONS
(To be completed by requesting department)
Source of County Funds (check one):
L Existing Appropriations,
"Contingency,
•Transfer of Existing Appropriations,
• Additional Appropriations, • Other (explain).
Identify Line Items(s):
Related Expenses: Amount $
Nature/Reason:
Anticipated Savings to County:
Net County Cost (this year):
Over Five Years:
Additional Comments/Explanation:
The County will generate the revenues necessary to pay this component of the Service Fee by levying benefit
assessments against all properties within the County Water District Zones of Assessment Z.
Prepared by: B.Barclay
Prepared On: 10/24/2023
Dut pdf
887X0R0 0457
AT AUTHORITY
MEMORANDUM
To:
From:
Subject:
Date:
William F.X. O'Neil, County Executive
Michael J. Keating, P.E, Executive Director 6BK
Dutchess County Water & Wastewater Authority
1 Lagrange Avenue
Poughkeepsie, NY 12603
845-486-3601 845-486-3656 FAX
[email protected]
Resolution Request
November 6, 2023
Please find attached a Resolution Request Form and Fiscal Impact Statement. The purpose of the
requested resolution is to obtain County consent to the issuance of Peach Road Water System (County
Water District Zone of Assessment Z) Notes and Bonds in an aggregate amount not to exceed
$2,200,000.00. The purpose of the Notes and Bonds is to fund construction of the Peach Road Water
System and interconnection to the Town of Poughkeepsie water distribution system. This will provide a
new water supply source for the BOCES Campus and Dutchess County auto center facility to replace the
current groundwater wells serving each property.
Debt service on the Notes and Bonds will become a component of the County Service Fee payable by the
County to the Authority pursuant to the Service Agreement by and between the County on behalf of the
County Water District and the Dutchess County Water and Wastewater Authority, Dated June 1, 1998,
Amended and Eighteenth Restatement as of July 1, 2022. The County will generate the revenues
necessary to pay this component of the Service Fee by levying benefit assessments against all properties
within the County Water District Zones of Assessment Z.
Cc:
Bridget Barclay, DCWWA
Environment Committee Roll Call
District
District 19 - Towns of North East, Stanford, Pine Plains, Milan
District 7 - Towns of Hyde Park and Poughkeepsie
District 25 - Towns of Amenia, Washington, Pleasant Valley
District 16 - Town of Fishkill and City of Beacon
District 10 - City of Poughkeepsie
District 1 - Town of Poughkeepsie
District 6 - Town of Poughkeepsie
District 13 - Towns of LaGrange, East Fishkill, and Wappinger
District 15 - Town of Wappinger
District 20 - Town of Red Hook/Tivoli
District 23 - Towns of Pawling, Beekman and East Fishkill
District 24 - Towns of Dover and Union Vale
Present:
Absent:
Vacant:
8
4
0
Resolution:
Motion:
Name
Pulver*
Truitt*
| Houston*
Valdés Smith*
Atkins*
Llaverias
D'Aquanni
Bolner
Cavaccini (C)
Munn
Hauser (VC)
Surman
Total:
Abstentions:
Yes
No
absent
absent
absent
absent
8
Yes
0
No
2023223 CONSENTING TO THE ISSUANCE BY THE DUTCHESS COUNTY WATER AND
WASTEWATER AUTHORITY OF ITS SERVICE AGREEMENT REVENUE NOTES AND
BONDS
DECEMBER 4, 2023
Roll Call Sheets
District
Present:
Absent:
Vacant:
District 19 - Towns of North East, Stanford, Pine Plains, Milan
District 7 - Towns of Hyde Park and Poughkeepsie
District 25 - Towns of Amenia, Washington, Pleasant Valley
District 16 - Town of Fishkill and City of Beacon
District 10 - City of Poughkeepsie
District 1 - Town of Poughkeepsie
District 2 - Towns of Pleasant Valley and Poughkeepsie
District 3 - Town of LaGrange
District 4 - Hyde Park
District 5 - Town of Poughkeepsie
District 6 - Town of Poughkeepsie
District 8 - City and Town of Poughkeepsie
District 9 - City of Poughkeepsie
District 11 - Towns of Rhinebeck and Clinton
District 12 - Town of East Fishkill
District 13 - Towns of LaGrange, East Fishkill, and Wappinger
District 14 - Town of Wappinger
District 15 - Town of Wappinger
District 17 - Town and Village of Fishkill
District 18 - City of Beacon and Town of Fishkill
District 20 - Town of Red Hook/Tivoli
District 21 - Town of East Fishkill
District 22 - Towns of Beekman and Union Vale
District 23 - Towns of Pawing, Beekman and East Fishkill
Resolution:
Motion:
0
Last Name
YES
Pulver
Truitt
Houston
Valdés Smith
Atkins
Llaverias
Sagliano
Polasek
Geller
Keith
D'Aquanni
Brendli
Johnson
Kearncy
Metzger
Bolner
Paoloni
Cavaccini
McHoul
Page
Munn
Caswell
Garito
Hauser
Surman
Total :
24
Yes
Abstentions:
NO
absent
No
2023223 CONSENTING TO THE ISSUANCE BY THE DUTCHESS COUNTY WATER AND
WASTEWATER AUTHORITY OF ITS SERVICE AGREEMENT REVENUE NOTES AND
BONDS
DECEMBER 7, 2023
Environment Committee Roll Call
District
Distic Hyde Park and Pleasant Valley
Distic 25- Amenia Washingo. Plan Valy a Mibrook
District 3 - LaGrange
District 16 - Fishkill and Beacon
District 9 - City of Poughkeepsie
District 1 - Town of Poughkeepsie
District 4 - Hyde Park and Town of Poughkeepsie
District 5 - Town of Poughkeepsie
District 6 - Town of Poughkeepsie
District 13 - East Fishkill and Wappinger
District 18 - City of Beacon and Fishkill
Present:
Absent:
Vacant:
District 24 - Dover and Pawling
Resolution:
V
Motion:
Name
Truitt*
Houston*
Polasek*
Valdés Smith*
Atkins*
Gorman
Lawler
D'Aquanni (C)
Kaul
Paoloni (VC)
Page
House
Total:
Abstentions:
Yes
No
Abreat
Abrent
absent
9
Yes
No
2025104 AMENDING RESOLUTION NO. 2023223 CONSENTING TO THE
ISSUANCE BY THE DUTCHESS COUNTY WATER AND WASTEWATER
AUTHORITY OF ITS SERVICE AGREEMENT REVENUE NOTES AND
BONDS
JULY 10, 2025
Roll Call Sheets
District
District 7 - Hyde Park and Pleasant Valley
District 25 - Amenia, Washington, Pleasant Valley & Millbrook
District 3 - LaGrange
District 16 - Fishkill and Beacon
District 9 - City of Poughkeepsie
District 1 - Town of Poughkeepsie
District 2 - LaGrange, Pleasant Valley & Town of Poughkeepsie
District 4 - Hyde Park and Town of Poughkeepsie
District 5 - Town of Poughkeepsie
District 6 - Town of Poughkeepsie
District 8 - City and Town of Poughkeepsie
District 10 - City of Poughkeepsie
District 11 - Clinton, Pleasant Valley, and Rhinebeck
District 12 - East Fishkill
District 13 - East Fishkill and Wappinger
District 14 - Wappinger and Town of Poughkeepsie
District 15 - Wappinger
District 17 - Town and Village of Fishkill
District 18 - City of Beacon and Fishkill
District 19 - North East, Stanford, Pine Plains, Milan & Red Hook
District 20 - Red Hook, Tivoli, and Rhinebeck
District 21 - East Fishkill
District 22 - Beekman and Union Vale
District 23 - Pawling, Beekman and East Fishkill
District 24 - Dover and Pawling
Resolution: V
Motion:
Last Name
YES
Truitt
Houston
Polasek
Valdés Smith
abseut
Atkins
Gorman
Travelpiece
Lawler
Absent
D'Aquanni
Kaul
Brendli
Johnson
Kearney
Metzger
Paoloni
Versaci
Faust
McHoul
Page
Drago
Munn
Caswell
Garito
Rolison
House
Total :
23
Yes
Abstentions:
NO
Present:
Absent:
Vacant:
No
2025104 AMENDING RESOLUTION NO. 2023223 CONSENTING TO THE
ISSUANCE BY THE DUTCHESS COUNTY WATER AND WASTEWATER
AUTHORITY OF ITS SERVICE AGREEMENT REVENUE NOTES AND
BONDS
JULY 14, 2025